CDA KC23WH Bruksanvisning
Läs nedan 📖 manual på svenska för CDA KC23WH (4 sidor) i kategorin Sjunka. Denna guide var användbar för 5 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/4

www.cda.eu
Ceramic Sinks
Installation

2
Installation
Before Installation
Oer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowl are compatible with the cabinets
themselves.
Confirm that with the sink in position:
• There is adequate space to install any taps or other required
accessories.
• There is adequate space to install the waste pipework and that any
necessary modification to internal shelves to accommodate the waste
(and trap) is acceptable.
• Access to any water stop-cock or other services will still be adequate
after the installation.
Cutting the tap hole
Only cut/punch the tap hole from the top face of the sink.
• Select the tap hole position based on whether left hand or right hand
drainer is required.
• Locate the centre of the required tap hole by transferring
measurements from the cast in features on the underside. Cover the
top of the tap hole cut-out area with masking tape.
• Caution: Ensure that the sink is supported under the hole to be cut
out.
• Using a centre punch and hammer, make an initial cut in the glaze at
the centre of the required hole.
• Still using the punch and hammer enlarge the cut to the full hole size
required for the tap by carefully chipping away.

3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
Installation
• Refer to the cut-out sizes on the back of this manual and use them
to mark out where the worktop needs to be cut. Double-check the
dimensions before cutting the worktop aperture.
• After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
• It is often easier to mount the taps, waste-fitting and overflow onto the
sink prior to fitting the sink to the worktop.
• Position the sink on the worktop, bedding it into a bed of silicone
sealant.
• After positioning the sink, leave it untouched for 24 hours to allow
the sealant to cure before any water is run into it.
• The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
• To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
o the tap and wait several minutes to verify that the water doesn’t
drain away.
• Empty the sink.
After fitting, ensure that the enclosed “Ceramic Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Produktspecifikationer
Varumärke: | CDA |
Kategori: | Sjunka |
Modell: | KC23WH |
Behöver du hjälp?
Om du behöver hjälp med CDA KC23WH ställ en fråga nedan och andra användare kommer att svara dig
Sjunka CDA Manualer

8 September 2024

8 September 2024

4 September 2024

4 September 2024

4 September 2024

4 September 2024

3 September 2024

3 September 2024

3 September 2024

3 September 2024
Sjunka Manualer
- Sjunka Smeg
- Sjunka Teka
- Sjunka Hotpoint-Ariston
- Sjunka Kernau
- Sjunka Blaupunkt
- Sjunka Concept
- Sjunka Hendi
- Sjunka Blanco
- Sjunka Rangemaster
- Sjunka Gustavsberg
- Sjunka Franke
- Sjunka Leisure
- Sjunka Nodor
- Sjunka Elkay
- Sjunka Schock
- Sjunka Caple
- Sjunka Roca
- Sjunka Foster
- Sjunka Advance Tabco
- Sjunka Eagle Group
- Sjunka Sani-Lav
- Sjunka Fulgor Milano
- Sjunka Laveo
- Sjunka Deante
- Sjunka Artusi
- Sjunka Tot Mate
- Sjunka Atosa
- Sjunka Kuchinox
- Sjunka Oliveri
- Sjunka Shaws
- Sjunka Seima
Nyaste Sjunka Manualer

4 Mars 2025

8 Januari 2025

3 Januari 2025

2 Januari 2025

31 December 2025

31 December 2025

29 December 2024

29 December 2024

29 December 2024

28 December 2024