CDA KVF21RSS Bruksanvisning
Läs nedan 📖 manual på svenska för CDA KVF21RSS (4 sidor) i kategorin Sjunka. Denna guide var användbar för 10 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/4
www.cda.eu
KVF21 & KVF22
Stainless Steel
Flush Mount Sinks
Installation
2
Installation
Before Installation
Thoroughly check the sink and any fittings for signs of transport (or
other) damage. Please note: After fitting, sinks cannot be returned for
credit or replacement.
Oer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowls are compatible with the cabinets
themselves.
Confirm that with the sink in position:
• There is adequate space to install any taps or other required
accessories.
• There is adequate space to install the waste pipe work and that any
necessary modification to internal shelves to accommodate the waste
(and trap) is acceptable.
• Access to any water stop-cock or other services will still be adequate
after the installation.
Installation
• Refer to the cut-out sizes on the back of this manual and use them
to mark out where the worktop needs to be cut. Double-check the
dimensions before cutting the worktop aperture.
• After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
• It is often easier to mount the taps, waste-fitting and overflow onto the
sink prior to fitting the sink to the worktop.
• The edges of the sink should be bedded onto a bead of silicone
(or similar) sealant, to create a barrier to the ingress of water and
3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
other items between sink and
worktop.
• After positioning the sink on the
worktop, position the fixing brackets
as shown in Fig. 1, then tighten their
screws.
• Do not use a power tool to tighten
the screws; by using a hand tool
it is easier to ensure that they are
tightened just enough to clamp
down on the worktop and no more.
• After fixing, ensure the sealant forms a continuous bead to prevent
water ingress.
• Remove any excess sealant using an appropriate method as
recommended by the sealant manufacturer.
• The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
• To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
o the tap and wait several minutes to verify that the water doesn’t
drain away.
• Empty the sink.
After fitting, ensure that the enclosed “Stainless Steel Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Fig. 1
Produktspecifikationer
Varumärke: | CDA |
Kategori: | Sjunka |
Modell: | KVF21RSS |
Behöver du hjälp?
Om du behöver hjälp med CDA KVF21RSS ställ en fråga nedan och andra användare kommer att svara dig
Sjunka CDA Manualer
8 September 2024
4 September 2024
2 September 2024
2 September 2024
31 Augusti 2024
31 Augusti 2024
31 Augusti 2024
30 Augusti 2024
29 Augusti 2024
28 Augusti 2024
Sjunka Manualer
- Sjunka Smeg
- Sjunka Teka
- Sjunka Hotpoint-Ariston
- Sjunka Kernau
- Sjunka Concept
- Sjunka Blanco
- Sjunka Rangemaster
- Sjunka Gustavsberg
- Sjunka Franke
- Sjunka Leisure
- Sjunka Nodor
- Sjunka Elkay
- Sjunka Schock
- Sjunka Caple
- Sjunka Roca
- Sjunka Foster
- Sjunka Advance Tabco
- Sjunka Sani-Lav
- Sjunka Deante
- Sjunka Artusi
- Sjunka Tot Mate
- Sjunka Kuchinox
- Sjunka Oliveri
- Sjunka Shaws
Nyaste Sjunka Manualer
16 Oktober 2024
14 Oktober 2024
13 Oktober 2024
13 Oktober 2024
13 Oktober 2024
13 Oktober 2024
5 Oktober 2024
4 Oktober 2024
4 Oktober 2024
3 Oktober 2024