Gossen Metrawatt METRISO 5024 Bruksanvisning

Läs nedan 📖 manual på svenska för Gossen Metrawatt METRISO 5024 (14 sidor) i kategorin Mätinstrument. Denna guide var användbar för 5 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare

Sida 1/14
Operating Instructions
METRISO5024
Insulation and Resistance Measuring Instrument
with Voltage Measuring Range
3-349-346-03
3/3.11
2 GMC-I Messtechnik GmbH
Figure 1 Controls
1 Measuring probe on housing (positive pole)
2Scale
2a Adjusting screw for mechanical zero balancing
3Rotary switch for
Ω : Low-resistance measurement (toggle switch in Ω position)
– 100 V/250 V/500 V:
Toggle switch in neutral position:
Voltage measurement
Test for absence of voltage and discharge capacitive DUTs
Toggle switch in MΩ position:
Insulation measurement with the selected test voltage
4Toggle switch for switching amongst V, Ω and MΩ
(with illuminated scale when Ω or MΩ is selected)
5Carrying strap
6 Battery compartment
7 Detaining fork
8 Test probe on coil cord (negative pole)
9 Opening for securing the test probe
10 LED for indicating device and battery status
(see chapter 4.2 and 4.3)
1
2
3
4
8
5
7
10
9
6
2a
GMC-I Messtechnik GmbH 3
Meanings of symbols on the instrument:
Indicates EC conformity
Continuous, doubled or reinforced insulation
Warning concerning a source of danger
(attention: observe documentation!)
CAT II Maximum allowable voltage between the test probes (1 and 8)
and earth is 600 V, category II.
This device may not be disposed of with the trash. Further
information regarding the WEEE mark can be accessed on
the Internet at www.gossenmetrawatt.com by entering the
search term ’WEEE’.
Table of Contents Page
1 Safety Precautions ...............................................................4
1.1 Defects and Excessive Stressing .......................................................... 4
2 Device Description ................................................................4
2.1 Using Device ......................................................................................4
2.2 Design Description .............................................................................. 4
3 Preparation for Device Operation .........................................5
3.1 Unpacking the Device .........................................................................5
3.2 Power Supply – Battery Replacement ................................................... 5
3.3 Checking the Mechanical Zero Point ....................................................5
3.4 Checking Device Functions .................................................................. 6
4 Operation ..............................................................................7
4.1 Voltage Measurement .........................................................................7
4.2
Insulation Resistance Measurement (VDE 0413, part 2 / EN 61557, part 2) ....... 8
4.3
Low-Resistance Measurement (VDE 0413, part 4 / EN 61557, part 4) ............... 9
5 Maintenance – Recalibration ..............................................10
5.1 Housing ........................................................................................... 10
5.2 Batteries ..........................................................................................10
5.2.1 Details on Power Consumption and Operating Time ............................ 10
5.3 Replacing the Fuse ........................................................................... 10
5.4 Recalibration .................................................................................... 11
5.5 Device Return and Environmentally Compatible Disposal ..................... 12
6 Characteristic Values ..........................................................12
7 Repair and Replacement Parts Service
Calibration Center
and Rental Instrument Service ...........................................14
8 Product Support .................................................................14
!

Produktspecifikationer

Varumärke: Gossen Metrawatt
Kategori: Mätinstrument
Modell: METRISO 5024

Behöver du hjälp?

Om du behöver hjälp med Gossen Metrawatt METRISO 5024 ställ en fråga nedan och andra användare kommer att svara dig




Mätinstrument Gossen Metrawatt Manualer

Mätinstrument Manualer

Nyaste Mätinstrument Manualer