CyberPower BPSE36V45ART2U Bruksanvisning
CyberPower
Accu
BPSE36V45ART2U
Läs nedan 📖 manual på svenska för CyberPower BPSE36V45ART2U (11 sidor) i kategorin Accu. Denna guide var användbar för 5 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/11
BPSE36V45A (72V45A)RT2U
User’s Manual
K01 C000049- -02
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important instructions. Please read and follow all instructions carefully
during installation and operation of the unit. Read this manual thoroughly before attempting to
unpack, install, or operate the Battery modules.
CAUTION! The UPS unit must be connected to a grounded AC power outlet with fuse or circuit
breaker protection. The Battery modules grounded are through the UPS.
CAUTION! The battery can power hazardous components inside the unit, even when the AC
input power is disconnected.
CAUTION! To prevent the risk of fire or electric shock, install in a temperature and humidity
controlled indoor area, free of conductive contaminants. (Please see specifications for
acceptable temperature and humidity range).
CAUTION! (No User Serviceable Parts): Risk of electric shock, do not remove cover. No user
serviceable parts inside. Refer servicing to qualified service personnel.
CAUTION! (Non-Isolated Battery Supply): Risk of electric shock, battery circuit is not
isolated from AC power source; hazardous voltage may exist between battery terminals and
ground. Test before touching.
CAUTION! Wiring must be done by qualified personnel.
CAUTION! DO NOT USE WITH OR NEAR AQUARIUMS! To reduce the risk of fire, do not
use with or near aquariums. Condensation from the aquarium can come in contact with metal
electrical contacts and cause the machine to short out.
CAUTION! Do not dispose of batteries in fire as the battery may explode.
CAUTION! Do not open or mutilate the battery, released electrolyte is harmful to the skin and
eyes.
CAUTION! A battery can present a risk of electric shock and high short circuit current. The
following precaution should be observed when working on batteries.
1
1. Remove watches, rings or other metal objects.
2. Use tools with insulated handles.
CAUTION! Make sure everything is turned off and disconnected completely before conducting
any maintenance, repairs or shipment.
CAUTION! Connect the Protection Earth (PE) safety conductor before any other cables are
connected.
DO NOT INSTALL THE WHERE IT WOULD BE EXPOSED TO DIRECT SUNLIGHT OR UNIT
NEAR A STRONG HEAT SOURCE!
SERVICING OF BATTERIES SHOULD BE PERFORMED OR SUPERVISED BY PERSONNEL
KNOWLEDGE OF BATTERIES AND THE REQUIRED PRECAUTIONS. KEEP
UNAUTHORIZED PERSONNEL AWAY FROM BATTERIES!
UNPACKING
UNPACKING
The box should contain the following : items
Batteries Module
User’s manual
Battery Cable
rackmount ears ( 2 PCS )
Rackmount rails ( L & R )
Flat head screws: M4 8) X8L (
Pan head screws: M5X12L (12)
Plastic washers (8)
Screw hole dust covers (8)
2
BASIC OPERATION
FRONT/REAR PANEL DESCRIPTION
BPSE36V45A , BPSE72V45A RT2U RT2U
1. Input Connector
Use this input connector to daisy chain the next Battery module. Remove the connector cover for
access.
2 -. On board Replaceable Fuse Cover
Replaceable fuse is accessible from the rear panel. It must be done by qualified personnel.
3 Battery . Output Connector
Use this output Connector to connect the Battery module to the Power module or to the next
Battery module.
HARDWARE INSTALLATION
These batteries modules can be mounted in a rackmount or vertical tower orientation. This
versatility is especially important to growing organizations with changing needs that value having
the option to position a batteries module on a floor or in a rackmount system. Please follo w the
instructions below for the respective mounting methods.
SAFETY PRECAUTIONS
CAUTION! To prevent the risk of fire or electric shock, only use the supplied hardware to attach
the mounting brackets.
3
Produktspecifikationer
Varumärke: | CyberPower |
Kategori: | Accu |
Modell: | BPSE36V45ART2U |
Behöver du hjälp?
Om du behöver hjälp med CyberPower BPSE36V45ART2U ställ en fråga nedan och andra användare kommer att svara dig
Accu CyberPower Manualer
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
26 September 2024
Accu Manualer
- Accu Bosch
- Accu Panasonic
- Accu DeWalt
- Accu Canon
- Accu Apc
- Accu A-solar
- Accu Vetus
- Accu Hikvision
- Accu Arris
- Accu Ozito
- Accu Black And Decker
- Accu Vonroc
- Accu Hilti
- Accu Ryobi
- Accu Parkside
- Accu Worx
- Accu Milwaukee
- Accu Hähnel
- Accu Cramer
- Accu Berg
- Accu Tripp Lite
- Accu Stinger
- Accu Toa
- Accu Energenie
- Accu Hama
- Accu Fujifilm
- Accu Sennheiser
- Accu Techly
- Accu Varta
- Accu Biltema
- Accu DJI
- Accu Powerplus
- Accu Stiga
- Accu Cobra
- Accu Valcom
- Accu McCulloch
- Accu Cortina
- Accu Conrad
- Accu Kress
- Accu Mestic
- Accu Fluke
- Accu For_Q
- Accu HQ
- Accu Fuxtec
- Accu Xtorm
- Accu Watson
- Accu Scosche
- Accu Anton/Bauer
- Accu Impact
- Accu Arctic Cooling
- Accu Toolcraft
- Accu Monacor
- Accu Energizer
- Accu Bolt
- Accu SolarEdge
- Accu Duracell
- Accu Anova
- Accu Sungrow
- Accu Ultron
- Accu Enphase
- Accu PNY
- Accu PowerDrive
- Accu Neewer
- Accu Lenmar
- Accu Renata
- Accu HART
- Accu APSystems
- Accu TCW Technologies
- Accu Enerdrive
- Accu Tecnoware
- Accu Ventev
Nyaste Accu Manualer
21 Oktober 2024
20 Oktober 2024
8 Oktober 2024
8 Oktober 2024
7 Oktober 2024
6 Oktober 2024
4 Oktober 2024
1 Oktober 2024
29 September 2024
26 September 2024