User’s Guide
UPS 8 – 10 kVA,
230V 50/60 Hz output
(1-phase input)
&
UPS 8 – 15 kVA,
230V 50/60 Hz output
(3-phase input)
Copyright 2007
The contents of this manual are the copyright of the publisher and may not be
reproduced (even extracts)
unless permission granted.
Every care has been taken to ensure the accuracy of
the information contained in this manual, but no liability
can be accepted for any errors or omission. The right
to make design modifications is reserved.
UPS 8 – 10 kVA, 230V 50/60 Hz output (1-phase input)
UPS 8 – 15 kVA, 230V 50/60 Hz output (3-phase input)
User’s Guide 1022403 revision D
Contents
1. Safety instructions ............................................................................................................................................................. 4
Audience .............................................................................................................................................................................. 4
CE marking ........................................................................................................................................................................... 4
User precautions ................................................................................................................................................................. 4
Environment ......................................................................................................................................................................... 5
Inquiries ................................................................................................................................................................................ 5
2. Mechanical installation .................................................................................................................................................... 6
Delivery check ..................................................................................................................................................................... 6
Unpacking and visual inspection ..................................................................................................................................... 6
3. Planning before installation ............................................................................................................................................. 8
4. Cabinet installation ........................................................................................................................................................... 9
Maiantenance bypass switch ........................................................................................................................................... 9
Transformer option ............................................................................................................................................................. 11
External battery cabinet option ........................................................................................................................................ 12
Battery racks ....................................................................................................................................................................... 12
5. Electrical installation ........................................................................................................................................................ 13
Power cables and protective fuses ................................................................................................................................. 14
Wiring procedure ................................................................................................................................................................ 15
External Battery Cabinet (EBC) installation procedure ................................................................................................ 21
6. Software and connectivity ................................................................................................................................................ 24
Communication cables ....................................................................................................................................................... 24
Connection to the standard RS-232 port (X53) ............................................................................................................... 24
LanSafe software ........................................................................................................................................................... 25
External control connections ............................................................................................................................................ 25
Emergency Power Off (EPO) ......................................................................................................................................... 26
Relay outputs ................................................................................................................................................................... 26
Programmable signal inputs ......................................................................................................................................... 27
XSlot communication (option) ........................................................................................................................................... 28
Web/SNMP Module (optional) ..................................................................................................................................... 28
AS400 Relay Module (optional) .................................................................................................................................... 29
Single Serial Port Module (optional) ........................................................................................................................... 29
Modus/Jbus Module (optional) .................................................................................................................................... 29
7. User operations ................................................................................................................................................................... 30
Display functions ................................................................................................................................................................. 30
User Settings ....................................................................................................................................................................... 31
Configuring user settings .............................................................................................................................................. 33
Changing language ........................................................................................................................................................ 33
Changing charging current ........................................................................................................................................... 33
Using relay outputs ........................................................................................................................................................ 33
Normal start-up ................................................................................................................................................................... 34
Battery start-up ................................................................................................................................................................... 34
Start-up after EPO ............................................................................................................................................................... 34
Shutdown ............................................................................................................................................................................. 35
8. Maintenance ....................................................................................................................................................................... 36
Regular service/intervals ................................................................................................................................................... 36
Batteries ........................................................................................................................................................................... 36
Cooling fan ....................................................................................................................................................................... 37
LED Indicators ..................................................................................................................................................................... 37
Maintenance bypass switch (MBS) operation .............................................................................................................. 37
Turn UPS from normal mode to mechanical bypass ................................................................................................ 38
Turn UPS from mechanical bypass to normal mode ................................................................................................ 39
9. Parallel systems ................................................................................................................................................................. 41
Overview ............................................................................................................................................................................... 41
Tie cabinets .......................................................................................................................................................................... 42
XSlot Hot Sync card: installing and wiring ..................................................................................................................... 46
Parallel operations .............................................................................................................................................................. 47
10 Recycling the used UPS or batteries .............................................................................................................................. 49
11. Dimensional drawings ...................................................................................................................................................... 50
12. Technical data ..................................................................................................................................................................... 52
Standards ............................................................................................................................................................................ 52
Environment ......................................................................................................................................................................... 52
Mechanical configuration ................................................................................................................................................. 52
Characteristics .................................................................................................................................................................... 52
AC input ................................................................................................................................................................................ 53
DC circuit .............................................................................................................................................................................. 53
AC output .............................................................................................................................................................................. 53
13. Warranty ............................................................................................................................................................................... 54
Produktspecifikationer
Varumärke: | Eaton |
Kategori: | UPS |
Modell: | Powerware 9155-10-N-25-64x9Ah |
Behöver du hjälp?
Om du behöver hjälp med Eaton Powerware 9155-10-N-25-64x9Ah ställ en fråga nedan och andra användare kommer att svara dig
UPS Eaton Manualer
11 Oktober 2024
29 Augusti 2024
23 Augusti 2024
18 Augusti 2024
14 Augusti 2024
13 Augusti 2024
13 Augusti 2024
12 Augusti 2024
12 Augusti 2024
11 Augusti 2024
UPS Manualer
- UPS AEG
- UPS IKEA
- UPS HP
- UPS Siemens
- UPS Apc
- UPS LC-Power
- UPS Tripp Lite
- UPS Energenie
- UPS Voltcraft
- UPS Emerson
- UPS Adj
- UPS Digitus
- UPS LevelOne
- UPS Jung
- UPS CyberPower
- UPS Block
- UPS Avocent
- UPS Minuteman
- UPS Maruson
- UPS V7
- UPS Salicru
- UPS Equip
- UPS Approx
- UPS SurgeX
- UPS Murr Elektronik
- UPS Altronix
- UPS Ditek
- UPS Bxterra
- UPS Middle Atlantic
- UPS FSP
- UPS Atlantis Land
- UPS PowerWalker
- UPS FSP/Fortron
- UPS Online USV
Nyaste UPS Manualer
24 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024
20 Oktober 2024
18 Oktober 2024
18 Oktober 2024
13 Oktober 2024
13 Oktober 2024
13 Oktober 2024