Sloan HYB-1000 Bruksanvisning
Läs nedan 📖 manual på svenska för Sloan HYB-1000 (1 sidor) i kategorin toalett. Denna guide var användbar för 3 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/1
®
A
B
HYB-1000 HYBRID URINAL
with Jetrinse™ Solution
with Jetrinse™ Solution
with Jetrinse™ Solution
with Jetrinse™ Solution with Jetrinse™ Solution
Technology
Technology
Technology
TechnologyTechnology
NEW CONSTRUCTION
INSTALLATION INSTRUCTIONS
BEFORE STARTING INSTALLATION:
IMPORTANT Do not install on copper DWV
due to copper’s susceptibility to corrosion.
TUBE CUTTING CHART
Measure drain nipple depth (inches) to find trim
length (inches)
13 7/8” or more DO NOT CUT
3 3/4” or less DO NOT USE TUBE
•
•
•
•
OR LESS TRIM
13 ¾" ¼"
13 ½ ½
13 ¼ ¾
13 1
12 ¾ 1¼
12 ½ 1½
12 ¼ 1¾
12 2
11 ¾ 2¼
11 ½ 2½
11 ¼ 2¾
11 3
10 ¾ 3 ¼
10 ½ 3 ½
OR SS TRIM LE
10 ¼" 3 ¾"
10 4
9 ¾ 4 ¼
9 ½ 4 ½
9 ¼ 4 ¾
95
8 ¾ 5 ¼
8 ½ 5 ½
8 ¼ 5 ¾
86
7 ¾ 6 ¼
7 ½ 6 ½
7 ¼ 6 ¾
77
OR LESS TRIM
6 ¾" 7 ¼"
6 ½ 7 ½
6 ¼ 7 ¾
68
5 ¾ 8 ¼
5 ½ 8 ½
5 ¼ 8 ¾
59
4 ¾ 9 ¼
4 ½ 9 ½
4 ¼ 9 ¾
410
C R REUSTOME CA
1-800-982-5839
customer.service@sloanvalve.com
CA NUTIO Af t r o n r in ro the er em ving a y u al f m
dr n ine t ’ai l , i s no tain n ally ormal for cer atur ccurring,
but t e poten l zardou ew tia ly ha s s er gases o escap
thro i n h waterl rtri e ugh the open ng u til t e ess ca dg
is t r rl nt water r l I you ins alled p ope y i o the less u ina . f
nee e n d t o av le a o r unatt fter pen d ain line ended a
remov ng ri rom wa l, te orari y we we r a i the u nal f the l mp l dge paper to ls o
rag into ra n to reduce the d i hole a ny ow wer s, d re ove outfl of se gase an m
the paper towels or ra ri r to co ri rtridge g p o mpleting the u nal or ca
ins llat onta i . Neve r smoke, have ce youan open flame, or pla r n or ose
mou h ne dra es waterl al nto w h t ar open in lin or ess urin housings i hic
a cart dg ye roperl d.ri e is not t p y installe Yo o wear a g u als can breathin
ma m isk rewhen ov ng li ny terl ri l or rtridg to or instal ng a wa ess u na ca e
reduce otent al ex sure to ny s p i po a such gase
Sloan.com
The information in this document is subject to change without notice.
©2018 Sloan Valve Company All rights reserved.
•
9
5
1
13
Cut away wall
Lift drain line & brace
with mending plate
½" to ¾"
9 MAX." for ADA
installation
standard 24" rim
fini hed oors fl
16”
4
6
32
C D
10 12
14
11
15
Arrow
tab UP
1234
A
C
B D E
Set drain line height 16” from finished floor
(standard 24” rim) or 9” Max. for ADA installation.
Threaded nipple should extend 1/2 to 3/4” from wall.
* IMPORTANT Nipple must not extend more than
3/4” past the finished wall
Carrier stud placement If
using in-wall carrier set
bearing as shown above.
A. Clean Face of drain nipple.
B. Install the clear inspection disc with the compression nut.
C. Slowly pour water into the drain.
D. Use a flashlight to check the pitch/slope no water should be
present in the inspection disc or nipple.
E. Remove disc and nut after inspection.
Adjust drain to achieve pitch only if standing water is present
(code requires 1/4” drop per foot of drain line for proper
pitch). Seal wall according to code.
Measure and mark rough in. If in-wall carrier
is not used. Use a 5/16” masonry bit to drill
hole, then install the hanger bracket with
one plastic anchor and screw.
11 10
12
8
Determine the drain nipple length by
measuring the distance between the back
of the sanitary tee (or elbow) to the front
edge of the nipple.
A. Find the drain nipple depth on the Tube
Cutting Chart (left). Measure and mark the
specified trim length on the insert tube at the
nearest 1/4” groove.
B. Cut the tube at the groove using a sharp
utility knife to ensure a square, flat cut.
C. Clean burrs from the cut end by using
emery paper.
D. Apply lubricant to the outside of the rubber
bushing and ribbed inside area.
E. Insert tube and bushing IMPORTANT. Be sure
arrow tab is at the 12:00 position.
Apply lubricant to
tailpipe of housing.
Place hose clamp and
compression nut onto
the housing tailpipe.
Drill holes with 3/16”
masonry bit for the
lower anchor screws
and insert plastic
anchors.
Hang the bowl inserting
tailpipe into bushing, and
tighten coupling and
hose clamp. Install anchor
screws with washers.
Connect battery A to wire B.
Wait 1 minute for system to start up. Note
system will allow 2 manual flushing before
pausing 30 seconds.
Put adaptor onto stop then
attach supply line to adapter.
Turn water on and assure there
are no connection leaks.
AB
7
A. Hang bowl on the bracket and check tail pipe alignment, then remove the bowl
and adjust the bracket as needed. Re-hang and re-check bowl alignment with the
drain line. Tail pipe should align with center of drain line.
B. Mark anchor holes then remove bowl without moving hanger bracket.
16
CARTR IDG E
INSTRUCTIONS
17 18
Caulk the bowl to the wall if
there is good flow and no leaks or
standing water in housing.
Install cartridge as per the
cartridge instruction sheet.
If standing water exists, line is
clogged or there is improper slope
installed in housing. See step 4, correct
and reinstall urinal
Wave hand under IR switch to
activate test rinse and ensure there
is no standing water in housing.
System will operate automatically
every 48 hours from battery plug in.
CORRECT
DOWN CH/HIL PITL SLOPE
( DE)MEET COS
INCORRECT
Not centered
CORRECT
Centered
Install 1/2” x 3/8” compression
straight stop with the handle facing
floor.
LOOKING AT WALL
LUBRICANT
*
21 ½”
Install Plastic Anchor Here
Insert Screws
Here
Drain
13 5/8
6 2/3
1/2
21 1/2
3¼"
3"
C
ADA requires a lip height of 17” or lower. To allow for
variances and assure compliance Sloan recommends
roughing the drain line to achieve a 16-½ ” lip height
Check slope. Downhill slope, per code, is essential
because waterfree urinals depend on gravity flow.
Check DWV material. Suitable materials include
cast iron, PVC, ABS and galvanized steel.
•
Produktspecifikationer
Varumärke: | Sloan |
Kategori: | toalett |
Modell: | HYB-1000 |
Behöver du hjälp?
Om du behöver hjälp med Sloan HYB-1000 ställ en fråga nedan och andra användare kommer att svara dig
toalett Sloan Manualer
7 September 2024
4 September 2024
4 September 2024
4 September 2024
4 September 2024
3 September 2024
toalett Manualer
- toalett IKEA
- toalett Philips
- toalett Tiger
- toalett Miomare
- toalett SereneLife
- toalett Pressalit
- toalett Thetford
- toalett Geberit
- toalett Dometic
- toalett Haier
- toalett Gustavsberg
- toalett TOTO
- toalett Sanibroyeur
- toalett Enders
- toalett Camry
- toalett Sunwind
- toalett Villeroy And Boch
- toalett Schütte
- toalett Coleman
- toalett Jabsco
- toalett RIDGID
- toalett Kohler
- toalett Brondell
- toalett Summer Infant
- toalett Kogan
- toalett PolyJohn
- toalett American Standard
- toalett Satellite
- toalett Oatey
- toalett Stimex
- toalett Barumi
- toalett MCombo
- toalett Curaqua
- toalett Caroma
- toalett La Playa
- toalett Duravit
- toalett Bemis
- toalett ProFlo
- toalett Gerber
Nyaste toalett Manualer
3 Januari 2025
3 Januari 2025
2 Januari 2025
2 Januari 2025
31 December 2025
30 December 2025
28 December 2024
28 December 2024
28 December 2024
28 December 2024