SolarEdge MTR-240-1PC1-DW-MW Bruksanvisning

SolarEdge Elmästare MTR-240-1PC1-DW-MW

Läs nedan 📖 manual på svenska för SolarEdge MTR-240-1PC1-DW-MW (18 sidor) i kategorin Elmästare. Denna guide var användbar för 8 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare

Sida 1/18
A
Inline Energy Meter
Quick Installation Guide
For Europe, APAC and South Africa
B
solaredge.com
Werner- - 6/Eckert Strasse 81829
Munich/GermanySolarEdge
Technologies Gmbh
Subject notice.to change without
© SolarEdge Technologies, Ltd.
All rights reserved. August 2021.
Usage Options
Mounting and Wiring
Box Contents
One (1) Energy meter
One ( ) Quick Installation Guide 1
One (1) RS485 Terminal block
1
34
Default Communication Metal Enclosure or Extended Range
Datasheet
See section C on back page for optional Modbus communication
Scan for SolarEdge
Energy Net plug-in kits
to use with the inverter
SolarEdge Energy Net
Complete Installation guide
Scan for SolarEdge Energy
Net plug-in installation guide
WARNING! HAZARD OF
ELECTRIC SHOCK DISCONNECT
POWER BEFORE SERVICE OR
INSTALLATION
NL3L2L1
Cross-section: 1.5 25 mm2/ 15 3 - AWG
L1
L2
L3
N
3 - 2%)Ø Meter Wiring Accuracy class A (
NL3L2L1
N
L3
L2
L1
Cross-section: 1.5 25 mm2/ 15 3 - AWG
OFF
3 - 1%)Ø Meter Wiring Accuracy class B (
CAUTION! DO NOT use circuit
breaker with a rated current of
more than 65A
N
L
Cross-section: 1.5 25
mm2/ 15 3 - AWG
230 400 / VAC Wye
Grid (max. 65A)
1 -Ø Meter Wiring Accuracy class B (1%)
CAUTION! DO
NOT use circuit
breaker with a
rated current of
more than 65A
NL
1.2Nm
1.2Nm
Connect to L3 when using this meter in 1Ø grid
Connect to L3 when using this meter in 1Ø grid
1.2Nm
RS485 Defaults:
Termination = ON
ID = 2
1
2
3
4
3 /X 230 400 VAC Wye Grid
(max. 65A per each phase)
3 /X 230 400 VAC Wye Grid
(max. 65A per each phase)
1.1Nm
2
Scan for External Energy Net
antenna installation guide
1 - 2%)Ø Meter Wiring Accuracy class A (
NL
NL
Cross-section: 1.5 –
25 mm2/ 15 3 - AWG
CAUTION! DO
NOT use circuit
breaker with a
rated current of
more than 65A 230 400 / VAC Wye
Grid (max. 65A)
1.2Nm
DE FR HU IT
NL PL SP SWE
1
COptional Modbus Connection (Not required when using SolarEdge Energy Net communication)
DConnecting and Managing the Meter Using the SetApp Application
Device Manager
Found new devices
Commissioning
Site Communication
SetApp
1
23
ON
OFF
RS485 1 - line Not Terminated
RS485 2 - line Terminated
SW SW1 2
RS485 1 - line Terminated
RS485 2 - line Not Terminated
ON
SW SW1 2
Set to OFF in StorEdge®inverter!
Keys, LED Indications and Screen Navigation
CAT -6 3 wire, shielded, twisted pair (0.2- ²)1 mm
RS485 485-1 or RS -2
B A G
Add Device
Firmware Upgrade (automatic)
Configure
Meter Function
AC-Grid Connection(1)
Meter Status
Done
Device manager
New Installed Device
P 1 0
P(2 Sec)
Setting the Inverter DIP SwitchesRS485 Wiring
4
Meter default Address ID: 2
RS RS485-1 485-2
B A G B A G
E
Set
Communication status:
Blinking Blue: Searching for
wireless connection.
Steady Blue: connected
To wakeup display:
press any key
Password
1231
Back Set
2
COMM 1000
IMP/KWh
Navigate down
Navigate up
To reset meter:
hold pressed
for 5 seconds
10 mm
RS485-1 -: Modbus (Multi Device)
Meter Function
Meter ID
Meter RS485 termination
AC-Grid Connection(1)
Meter 1
Configure
Meter Status
Done
Site Communication
(1) 3 -Ø meter only Default: Top (recommended)
Support Contact Information
If you have technical problems concerning SolarEdge products, please contact us: https://www.solaredge.com/service/support
Orange blinking: 1000 1 pulses per hour = kW
To reset wireless
connection: hold up
and down
pressed together for
5 seconds
For RS485 For Energy Net
MODBUS ID
RS485 Term
Factory Reset
Info
Back
Modbus ID
002
Back Set
Terminate
No Terminate
Back
Factory Reset
Back
Factory Reset
Are You Sure?
Back Set
Version: X.X.XX
A
Inline Energiezähler-
Installationsanleitung ( )Kurzfassung
Für Europa, den asiatisch-pazifischen Raum und
Südafrika
B
solaredge.com
Werner- - 6/Eckert Strasse 81829
Munich/GermanySolarEdge
Technologies Gmbh
Änderungen ohne vorherige
Ankündigung vorbehalten..
© SolarEdge Technologies, Ltd.
Alle Rechte vorbehalten.
August 2021.
Anwendungsoptionen
Montage und Verkabelung
Lieferumfang
Ein (1) Energiezähler
Eine (1 ( )) Installationsanleitung Kurzfassung
Eine (1 -) RS485 Klemmleiste
1
34
Standard-Kommunikationsoption Metallgehäuse Reichweiteoder Größere
Datenblatt
Siehe Abschnitt C auf der Rückseite für optionale Modbus-
Kommunikation
Scannen für die
SolarEdge Energy Net
Plug-In Kits für den
Wechselrichter
SolarEdge Energy Net
Vollständige
Installationsanleitung
Scannen für EnergyNet-
Modul Installationsanleitung
WARNUNG!
STROMSCHLAGGEFAHR!
SCHALTEN SIE VOR WARTUNG
ODER INSTALLATION DEN AC-
STROM AUS
NL3L2L1
Querschnitt: 1,5 25 mm2
L1
L2
L3
N
3Ø-Verkabelung Zähler -Genauigkeitsklasse A (2%)
NL3L2L1
N
L3
L2
L1
Querschnitt: 1,5 25 mm2
AUS
3Ø-Verkabelung Zähler -Genauigkeitsklasse B (1%)
VORSICHT! Verwenden Sie
KEINEN Leitungsschutzschalter
mit einem Nennstrom von
mehr als 65 A
N
L
Querschnitt: 1,5 25 mm2
230 400 / VAC-
Sternpunkt-Netz
(max. 65 A)
1Ø-Verkabelung Zähler -
Genauigkeitsklasse B (1%)
VORSICHT! Verwenden
Sie KEINEN
Leitungsschutzschalter
mit einem Nennstrom
von mehr als 65 A
NL
1.2Nm
1.2Nm
An L3 anschließen, falls Sie diesen Zähler in
einem 1Ø Netz verwenden
An L3 anschließen, falls Sie diesen Zähler in
einem 1Ø Netz verwenden
1.2Nm
Standard RS485
Terminierung: AUS
ID: 2
1
2
3
4
3 / VAC-x 230 400
Sternpunkt- A Netz (max. 65
pro phase)
3 / VAC- -x 230 400 Sternpunkt
Netz (max. 65 A pro phase)
1.1Nm
2
Scannen für EnergyNet-
Antenne
Installationsanleitung
1Ø-Verkabelung Zähler -
Genauigkeitsklasse A (2%)
NL
NL
Querschnitt: 1,5 25 mm2
VORSICHT!
Verwenden Sie
KEINEN
Leitungsschutzsc
halter mit einem
Nennstrom von
mehr als 65 A
230 400 / VAC-
Sternpunkt-Netz
(max. 65 A)
1.2Nm

Produktspecifikationer

Varumärke: SolarEdge
Kategori: Elmästare
Modell: MTR-240-1PC1-DW-MW

Behöver du hjälp?

Om du behöver hjälp med SolarEdge MTR-240-1PC1-DW-MW ställ en fråga nedan och andra användare kommer att svara dig