Wolf CGB-2-100 Bruksanvisning
Wolf
Centralvärmepanna
CGB-2-100
Läs nedan 📖 manual på svenska för Wolf CGB-2-100 (64 sidor) i kategorin Centralvärmepanna. Denna guide var användbar för 4 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/64
WOLF GMBH / POSTFACH 1380 / D-84048 MAINBURG / TEL. +49.0.87 51 74- 0 / FAX +49.0.87 51 74- 16 00 / www.WOLF.eu
Doc. no.: 3062555_201804 Subjecttomodications
GB
Installationandoperatinginstructions
Wall mounted gas condensing boiler
CGB wall mounted gas condensing boiler
CGB-75
CGB-100
2 3062555_201804
Tableofcontents
1. Documentation information 3 ................................................................
2. Safety information 4 ..............................................................................
3. Standards and regulations 7 .................................................................
4. Control / Function / Operation 10 ........................................................
5. Delivered condition / standard delivery 12 ............................................
6. Layout ..............................................................................................13
7. Siting instructions 14 ............................................................................
8. Installation .......................................................................................15
9. Dimensions/installation dimensions 16 .................................................
Installation
10. Installation .......................................................................................17
11. Installation of the air/flue gas routing 21 ...............................................
Control
12. Electrical connection 22 ........................................................................
Commissioning
13. Filling the system 28 .............................................................................
14. Conversion to natural gas E/LL (G20/G25) (if necessary) 29 ...............
15. Conversion to LPG P (G31) (if necessary) 30 ......................................
16. Conversion to other gas types (if required) 31 .....................................
17. Checking the gas supply pressure 32 ..................................................
18. Commissioning / setting the BUS address 33 ......................................
19. Displaying / modifying control parameters 34 .......................................
20. Adjusting the modulating pump (accessory) 35 ....................................
21. Limiting the maximum output 36 ...........................................................
22. Testing the combustion parameters 37 .................................................
23. CO2 adjustments 38 .............................................................................
24. Commissioning report 40 ......................................................................
Specication
25. Maintenance and design data 41 .........................................................
26. Technical information for water treatment 43 ........................................
27. System log 45 .......................................................................................
28. Technical information 46 .......................................................................
29. Wiring diagram 56 ................................................................................
30. Specification .................................................................................... 57
31. Troubleshooting ...............................................................................58
32. Product datasheet to EU regulation No. 811/2013 60 ..........................
33. Technical parameters to EU Regulation No. 813/2013 61 ....................
34. Notes ............................................................................................... 62
EU declaration of conformity 63 ...................................................................
33062555_201804
1. Documentationinformation
1.1 Otherapplicabledocuments
- Technical information
- Maintenance instructions
- System and operator’s log
The instructions for all accessory modules and other accessories also apply where
relevant.
1.2 Safekeepingofthesedocuments
The system user or operator should ensure the safekeeping of all instruction manuals
and documents.
► Handovertheseinstallationinstructionsaswellasallotherapplicablemanuals
to the system user or operator.
1.3 Instructingthesystemuser
- Instruct the system user to take out an inspection and maintenance contract with
an approved contractor.
- Inform the system use that the annual inspection and maintenance may only be
performed by an approved contractor.
- Inform the system use that repair work may only be performed by an approved
contractor.
- Inform the system user that only original spare parts may be used.
- Inform the system user that no technical changes may be made to the boiler or
control unit.
- Inform the system user that they are responsible for the safety, environmental com-
patibility and energy quality of the heating system (German Immission Control Act/
Energy Saving Ordinance) [Germany].
- Inform the system user that these instructions and the other applicable documents
must be kept in a safe place.
- Instruct the system user how to operate the heating system.
1.4 Applicabilityoftheseinstructions
These installation instructions apply to CGB-75/100 gas condensing boilers.
1.5 Acceptance
Within four weeks of commissioning of the burner the operator must notify the local
flue gas inspector accordingly. According to the Bundes-KÜO (German Federal
Sweeping and Inspection Act), tests and inspections are only required every 3 years
[Germany].
1.6 Recyclinganddisposal
- Old equipment may only be disconnected from the gas and electricity supply by a
qualiedcontractor.
- Always dispose of materials according to environmental, recycling and waste man-
agement standards.
- Old appliances, wearing parts, defective components and environmentally hazard-
ous liquids and oils must be disposed of or recycled according to applicable waste
disposal regulations without harming the environment.
Theymustnotbedisposedofashouseholdwaste.
- Disposeofpackagingmadeofcardboard,recyclableplasticsandsyntheticller
materials in an environmentally compatible manner through appropriate recycling
systems or a recycling centre.
- Please observe the applicable national and local regulations.
Produktspecifikationer
Varumärke: | Wolf |
Kategori: | Centralvärmepanna |
Modell: | CGB-2-100 |
Behöver du hjälp?
Om du behöver hjälp med Wolf CGB-2-100 ställ en fråga nedan och andra användare kommer att svara dig
Centralvärmepanna Wolf Manualer
16 September 2024
16 September 2024
16 September 2024
16 September 2024
16 September 2024
16 September 2024
16 September 2024
Centralvärmepanna Manualer
- Centralvärmepanna ATAG
- Centralvärmepanna Bosch
- Centralvärmepanna Junkers
- Centralvärmepanna Nefit
- Centralvärmepanna Remeha
- Centralvärmepanna Vaillant
- Centralvärmepanna A.O. Smith
- Centralvärmepanna ACV
- Centralvärmepanna AGPO
- Centralvärmepanna De Dietrich
- Centralvärmepanna Intergas
- Centralvärmepanna Buderus
- Centralvärmepanna Elco
- Centralvärmepanna Masterwatt
- Centralvärmepanna Ferroli
- Centralvärmepanna Ariston Thermo
- Centralvärmepanna Viessmann
- Centralvärmepanna Itho-Daalderop
- Centralvärmepanna Worcester
- Centralvärmepanna Bulex
- Centralvärmepanna AWB
- Centralvärmepanna Fantini Cosmi
- Centralvärmepanna Daalderop
- Centralvärmepanna Tzerra
- Centralvärmepanna Baxi
- Centralvärmepanna Weishaupt
- Centralvärmepanna Morco
- Centralvärmepanna Oertli
- Centralvärmepanna Ygnis
- Centralvärmepanna ROC
- Centralvärmepanna Thermona
Nyaste Centralvärmepanna Manualer
27 Oktober 2024
19 Oktober 2024
17 Oktober 2024
17 Oktober 2024
17 Oktober 2024
17 Oktober 2024
15 Oktober 2024
10 Oktober 2024
8 Oktober 2024
7 Oktober 2024