Biasi Inovia Combi 25C ERP Bruksanvisning
Biasi
Pannor & pannor
Inovia Combi 25C ERP
Läs nedan 📖 manual på svenska för Biasi Inovia Combi 25C ERP (92 sidor) i kategorin Pannor & pannor. Denna guide var användbar för 6 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/92
Wall hung, fanflue, roomsealed, high efficiency gas boiler
User manual and
Installation instructions
Inovia ERP
Models G.C. Appl. No.
Inovia 25C ERP 47-583-38
Inovia 30C ERP 47-583-39
Inovia 35C ERP 47-583-40
- 2 -
WARNING
Congratulations on your choice.
Inovia ERP are condensing high efciency sealed chamber fan ue gas boilers. They are
fully electronically controlled and have electronic ignition.
The materials they are made of and the control systems they are equipped with give you
safety, a high level of comfort and energy savings to allow you to get the greatest benet out
of independent heating.
Inovia ERP allow a higher efciency by reducing the ue gas temperature such that the
water vapour formed during the combustion is condensed out.
This allows a gain of useful heat that otherwise would be lost.
Biasi UK Ltd is a licensed member of the Benchmark Scheme which aims to improve the
standards of installation and commissioning of domestic heating and hot water systems in
the UK and to encourage regular servicing to optimise safety, efciency and performance.
Benchmark is managed and promoted by the Heating and Hot water Industry Council. For
more information visit www.centralheating.co.uk.
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of mechanical or generic origin (e.g.: Injuries or bruises).
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of electric origin (electrocution).
DANGER: The indications marked with this symbol must be observed to pre-
vent the risk of re or explosion.
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of heat origin (burns).
ATTENTION: The indications marked with this symbol must be observed to
prevent malfunctioning and/or damage to materials of the appliance or other
objects.
ATTENTION: The indications marked with this symbol is important informa-
tion that must be carefully read.
- 3 -
WARNING
Remember that...
The manual must be read thoroughly, so that you will be able to use the boiler in a safe
and sensible way; must be carefully kept. It may be necessary for reference in the future.
The lighting up must be carried out by competent and responsible engineer.
The manufacturer
• disclaim all liability for any translations of the present manual from which incorrect inter-
pretation may occur;
• cannot be held responsible for non-observance of instructions contained in this manual
or for the consequences of any procedure not specically described.
Guarantee conditions
• The guarantee registration form must be returned within 30 of purchase, failure to com-
ply will invalidate the guarantee.
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have signed
it to say that you have received a full and clear explanation of its operation. The installer is
legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England and Wales).
All installations must be notied to Local Area Building Control either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certicate will then be
issued to the customer who should, on receipt, write the Notication Number on the Bench-
mark Checklist.
This product should be serviced regularly to optimise its safety, efciency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist will be required in the event of any warranty.
Using the boiler...
Before lighting the boiler you are advised to have a Gas Safety Registered Engineer
check that the installation of the gas supply
• is gas-tight;
• is of the correct gauge for the ow to the boiler;
• is tted with all the safety and control devices required by the current Regulations.
Ensure that
• Check with the Installer that he has connected and terminated the pressure relief valve
in a manner which allows safe discharge. The manufacturers are not responsible for
damage caused by opening of the pressure relief valve and consequent escape of wa-
ter, if this is not connected and terminated.
• The installer has connected the condensate outlet to a suitable drain pipe.
Produktspecifikationer
Varumärke: | Biasi |
Kategori: | Pannor & pannor |
Modell: | Inovia Combi 25C ERP |
Behöver du hjälp?
Om du behöver hjälp med Biasi Inovia Combi 25C ERP ställ en fråga nedan och andra användare kommer att svara dig
Pannor & pannor Biasi Manualer
27 Juli 2024
27 Juli 2024
27 Juli 2024
Pannor & pannor Manualer
- Pannor & pannor Electrolux
- Pannor & pannor ATAG
- Pannor & pannor Bosch
- Pannor & pannor AEG
- Pannor & pannor Philips
- Pannor & pannor Panasonic
- Pannor & pannor BEKO
- Pannor & pannor Inventum
- Pannor & pannor Junkers
- Pannor & pannor Nefit
- Pannor & pannor Remeha
- Pannor & pannor Siemens
- Pannor & pannor Whirlpool
- Pannor & pannor Vaillant
- Pannor & pannor ACV
- Pannor & pannor GE
- Pannor & pannor Orbegozo
- Pannor & pannor Fagor
- Pannor & pannor Gorenje
- Pannor & pannor Hitachi
- Pannor & pannor Teka
- Pannor & pannor Hisense
- Pannor & pannor Vox
- Pannor & pannor Hotpoint
- Pannor & pannor Sencor
- Pannor & pannor Midea
- Pannor & pannor De Dietrich
- Pannor & pannor Solac
- Pannor & pannor Svan
- Pannor & pannor Daikin
- Pannor & pannor Intergas
- Pannor & pannor Stiebel Eltron
- Pannor & pannor Buderus
- Pannor & pannor Dometic
- Pannor & pannor Elco
- Pannor & pannor Dimplex
- Pannor & pannor Masterwatt
- Pannor & pannor Nibe
- Pannor & pannor Ferroli
- Pannor & pannor Haier
- Pannor & pannor Ariston Thermo
- Pannor & pannor Elba
- Pannor & pannor Corberó
- Pannor & pannor Kelvinator
- Pannor & pannor Mora
- Pannor & pannor Buffalo
- Pannor & pannor Viessmann
- Pannor & pannor Franke
- Pannor & pannor Camry
- Pannor & pannor Jocel
- Pannor & pannor Worcester
- Pannor & pannor Atlantic
- Pannor & pannor Technika
- Pannor & pannor Plieger
- Pannor & pannor Bulex
- Pannor & pannor Tesy
- Pannor & pannor Waeco
- Pannor & pannor AWB
- Pannor & pannor HTW
- Pannor & pannor Quooker
- Pannor & pannor Edilkamin
- Pannor & pannor OSO
- Pannor & pannor Kunft
- Pannor & pannor Clage
- Pannor & pannor Noveen
- Pannor & pannor Joven
- Pannor & pannor Daalderop
- Pannor & pannor Cointra
- Pannor & pannor Baxi
- Pannor & pannor Rommer
- Pannor & pannor Quantum
- Pannor & pannor Morco
- Pannor & pannor Thermor
- Pannor & pannor Khind
- Pannor & pannor SolarEdge
- Pannor & pannor LERAN
- Pannor & pannor Ygnis
- Pannor & pannor Intellihot
- Pannor & pannor Airthereal
- Pannor & pannor Thermoflow
- Pannor & pannor Apricus
- Pannor & pannor Rinnai
- Pannor & pannor Sime
- Pannor & pannor Kospel
- Pannor & pannor Neopower
- Pannor & pannor My-PV
- Pannor & pannor EvoHeat
- Pannor & pannor Rheem
- Pannor & pannor Mission Air
- Pannor & pannor Solahart
- Pannor & pannor ENEFT
- Pannor & pannor AquaTech
- Pannor & pannor Imarflex
- Pannor & pannor MicroHeat
- Pannor & pannor Noritz
Nyaste Pannor & pannor Manualer
26 Oktober 2024
23 Oktober 2024
23 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024
22 Oktober 2024