Fluke BP190 Bruksanvisning
Läs nedan 📖 manual på svenska för Fluke BP190 (2 sidor) i kategorin Accu. Denna guide var användbar för 2 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare
Sida 1/2

BP190
NiMH Rechargeable Battery Pack
Instruction Sheet
Introduction
The BP190 is a NiMH (Nickel-Metal Hydride)
Rechargeable Battery Pack designed for use with the
Fluke ScopeMeter 190 series.
Specifications
Nominal voltage: 7.2 V
Capacity: 3500 mAh
Allowable ambient temperature during storage:
-20 °C to +60 °C (-4 °F to +140 °F)
Allowable ambient temperature during operating :
0 °C to +50 °C (+32 °F to +122 °F)
Allowable ambient temperature during charging:
0 °C to +40 °C (+32 °F to +104 °F)
June 1999, Rev.1, 10/01
© 1999,2001 Fluke Corporation,
All rights reserved.
Printed in the Netherlands
All product names are trademarks of their respective companies.
Using the Battery Safely
In this instruction sheet a Warning identifies conditions
and actions that pose hazard(s) to the user. Symbols
used on the BP190 and in this instruction sheet are
explained in the next table.
Recycling information
Disposal information
Warning
Do the following to avoid electrical shock
or fire:
• Do not short circuit the battery.
• Do not expose the battery to fire
Disposing the Battery Pack
Do not dispose of the NiMH (Nickel-Metal
Hydride) battery pack with other solid waste.
Used batteries should be disposed of by a
qualified recycler or hazardous materials
handler. Contact your authorized FLUKE
Service Center for recycling information.
General Battery Care
The life of NiMH batteries is strongly influenced by the
care that they receive. If properly maintained, the
battery is capable of more than 500 charge/discharge
cycles before dropping to 80% of capacity. Do not
exceed the allowable ambient temperatures during
charging, operating, or storage.
Caution
To prevent decrease of the battery
capacity, you must charge the batteries at
least once a year.
Limited Warranty & Limitation Of Liability
This Fluke product will be free from defects in material
and workmanship for one year from the date of
purchase. This warranty does not cover damage from
accident, neglect, misuse or abnormal conditions of
operation or handling. Resellers are not authorized to
extend any other warranty on Fluke’s behalf. To obtain
service during the warranty period, send your defective
product to the nearest Fluke Authorized Service Center
with a description of the problem.
THIS WARRANTY IS YOUR ONLY REMEDY. NO
OTHER WARRANTIES, SUCH AS FITNESS FOR A
PARTICULAR PURPOSE, ARE EXPRESSED OR
IMPLIED. FLUKE IS NOT LIABLE FOR ANY SPECIAL,
INDIRECT, INCIDENTAL OR CONSEQUENTIAL
DAMAGES OR LOSSES, ARISING FROM ANY
CAUSE OR THEORY.
Since some states or countries do not allow the
exclusion or limitation of an implied warranty or of
incidental or consequential damages, this limitation of
liability may not apply to you.
Fluke Corporation Fluke Industrial B.V.
P.O. Box 9090 P.O. Box 90
Everett WA 7600 AB Almelo
98206-9090, USA The Netherlands
Service Centres
For service information, contact your Fluke service
center. To locate an authorized service center, visit us
on the World Wide Web:
http://www.fluke.com
or call Fluke using any of the phone numbers listed
below:
+1-888-993-5853 in U.S.A. and Canada
+31-402-675-200 in Europe
+1-425-446-5500 from other countries
®

Replacing the Battery Pack
Warning
To avoid electrical shock, remove the test
leads and probes before replacing the
battery pack.
Usually it should not be necessary to replace the
battery pack. However, if you replace the battery pack,
follow steps 1 to 9. (See the figures.) Use a #10 Torx
screwdriver for all screws.
Disconnect the test leads and probes both at the source
and at the test tool before you open the test tool.
1. Loosen the two screws of the top cover.
2. Place the test tool face down and loosen the two
screws of the bottom cover.
3. Remove the top cover and bottom cover.
4. Loosen the two screws of the back cover.
5. Lift the back cover away from the test tool.
6. Take the battery out of the battery compartment.
7. Remove the battery plug from the connector.
8. Install a new battery pack.
Note
Ensure that the battery pack is placed in the
battery compartment as shown in step
. Use
only the Fluke BP190 NiMH Battery Pack.
9. Reinstall all covers in reversed order.
Note
When new, the NiMh battery may be empty
and must be charged for 4 hours (test tool is
off) to fill it completely.
Produktspecifikationer
Varumärke: | Fluke |
Kategori: | Accu |
Modell: | BP190 |
Behöver du hjälp?
Om du behöver hjälp med Fluke BP190 ställ en fråga nedan och andra användare kommer att svara dig
Accu Fluke Manualer

8 Oktober 2024

25 Augusti 2024

17 Augusti 2024
Accu Manualer
- Accu Sony
- Accu LG
- Accu Bosch
- Accu Panasonic
- Accu DeWalt
- Accu Epson
- Accu JVC
- Accu Nikon
- Accu Canon
- Accu Apc
- Accu Aluratek
- Accu Ansmann
- Accu A-solar
- Accu Vetus
- Accu Hikvision
- Accu Arris
- Accu Ozito
- Accu Leica
- Accu Nedis
- Accu Black And Decker
- Accu Vonroc
- Accu Hilti
- Accu Ryobi
- Accu Targus
- Accu Metabo
- Accu Parkside
- Accu Worx
- Accu Milwaukee
- Accu Hähnel
- Accu Victron Energy
- Accu Cramer
- Accu Berg
- Accu Tripp Lite
- Accu Stinger
- Accu Toa
- Accu Energenie
- Accu Einhell
- Accu Hama
- Accu Fujifilm
- Accu Kensington
- Accu Sennheiser
- Accu Techly
- Accu Varta
- Accu Petzl
- Accu Sandberg
- Accu Biltema
- Accu Digitus
- Accu Nitecore
- Accu DJI
- Accu Powerplus
- Accu Stiga
- Accu Growatt
- Accu Deltaco
- Accu Cobra
- Accu Valcom
- Accu McCulloch
- Accu Cortina
- Accu Carat
- Accu Shure
- Accu Conrad
- Accu Kress
- Accu Mestic
- Accu For_Q
- Accu Greenworks
- Accu CyberPower
- Accu HQ
- Accu Fuxtec
- Accu Xtorm
- Accu Ranex
- Accu Watson
- Accu Scosche
- Accu Anton/Bauer
- Accu Cocraft
- Accu Impact
- Accu SKROSS
- Accu Arctic Cooling
- Accu Crestron
- Accu Toolcraft
- Accu Monacor
- Accu Energizer
- Accu Fein
- Accu Bolt
- Accu Team Orion
- Accu SolarEdge
- Accu BlackVue
- Accu Venom
- Accu Duracell
- Accu Inovonics
- Accu Anova
- Accu Red Power
- Accu Sungrow
- Accu Ultron
- Accu Enphase
- Accu EGO
- Accu E-flite
- Accu Whistler
- Accu PNY
- Accu PowerDrive
- Accu LSI
- Accu Variotek
- Accu Neewer
- Accu Lenmar
- Accu Renata
- Accu Fxlion
- Accu PowerBass
- Accu SOUNDBOKS
- Accu FeinTech
- Accu Verico
- Accu Levolta
- Accu HART
- Accu APSystems
- Accu TCW Technologies
- Accu Enerdrive
- Accu Tecnoware
- Accu Ventev
- Accu PAG
Nyaste Accu Manualer

20 Februari 2025

20 Februari 2025

4 Januari 2025

3 Januari 2025

1 Januari 2025

31 December 2025

31 December 2025

31 December 2025

31 December 2025

30 December 2025