Seaward PV200 Bruksanvisning

Läs nedan 📖 manual på svenska för Seaward PV200 (34 sidor) i kategorin Mätutrustning. Denna guide var användbar för 2 personer och betygsatt med 4.5 stjärnor i genomsnitt av 2 användare

Sida 1/34
seaward.com
TESTED. TRUSTED… WORLDWIDE
PV200 / PV210
USER MANUAL
SEAWARD PV200/ PV210 USER MANUAL
TESTED. TRUSTED… WORLD WIDE Page of 2 34
Limited Warranty & Limitation of Liability
SEAWARD Electronic Limited guarantees this product to be free from defects in material and
workmanship under normal use and service for a period of 2 year, provided the instrument is serviced
and calibrated by authorised agent in accordance with the manufactures instructions. The period of
warranty will be effective at the day of delivery.
Manufacturer does not provide any warranty for the following:
Any normal wear and tear;
Errors or damage caused by: (i) misuse or not using your product in accordance with the user guide,
such as if the product has been exposed to moisture, to dampness or to extreme thermal or
environmental conditions or to rapid changes in such conditions, to corrosion, to oxidation, to
spillage of food or liquid or to influence from chemical products, (ii) using your product with, or
connecting it to, any product, accessory, software, or service not manufactured or supplied by the
manufacturer, (iii) any products combined with your product by a third party, (iv) damage or errors
caused by hacking, cracking, viruses, or other malware, or by unauthorised access to services,
accounts, computer systems or networks; or (v) other acts beyond the manufacturer’s reasonable
control.
This Warranty is not valid:
If your product, or the software it runs on, has been (i) opened, modified, or repaired without the
manufacturer’s authorisation, or (ii) repaired with unauthorised spare parts;
If you have not installed the latest software updates that are publicly available for your product
within a reasonable time of their release; or
If you refuse to give possession of the product to the manufacturer for repair and investigation.
(c) Copyright 2018
All rights reserved. Nothing from this edition may be multiplied, or made public in any form or manner,
either electronically, mechanically, by photocopying, recording, or in any manner, without prior written
consent from SEAWARD Electronic Limited. This also applies to accompanying drawings and diagrams.
Due to a policy of continuous development SEAWARD Electronic Limited reserves the right to alter the
equipment specification and description outlined in this publication without prior notice and no part of
this publication shall be deemed to be part of any contract for the equipment unless specifically referred
to as an inclusion within such contract.
SEAWARD PV200/ PV210 USER MANUAL
TESTED. TRUSTED… WORLD WIDE Page of 3 34
Table of Contents
Limited Warranty & Limitation of Liability .............................................................................................................................. 2
Table of Contents ..................................................................................................................................................................................... 3
1 User Notes ................................................................................................................................................................................................. 4
2 Safety Notes ............................................................................................................................................................................................ 5
3 Accessories ............................................................................................................................................................................................... 7
3.1 Standard Contents ......................................................................................................................................................................7
3.2 Optional Accessories / Replacement Parts ................................................................................................................7
4 Unit Description....................................................................................................................................................................................8
4.1 Identifying parts of the unit .................................................................................................................................................. 8
4.2 LCD display ...................................................................................................................................................................................... 9
5 Using the Seaward PV200/210 ................................................................................................................................................. 10
5.1 Powering On the PV200/210 ............................................................................................................................................... 10
5.2 Battery Condition Check ...................................................................................................................................................... 10
5.3 Setting the date and time ................................................................................................................................................... 10
5.4 Protective Earth Resistance (Rpe) Function .............................................................................................................. 11
5.4.1 Test lead resistance null ....................................................................................................................................................... 11
5.4.2 Resistance Measurement .................................................................................................................................................. 12
5.5 Voltage Measurement ............................................................................................................................................................. 13
5.6 Point to Point Insulation Resistance (Riso) Function ......................................................................................... 14
5.7 Auto Sequence Measurement ........................................................................................................................................... 15
5.7.1 Selecting Automatic Test Sequence........................................................................................................................... 15
5.7.2 Automatic Sequence ........................................................................................................................................................... 17
5.7.3 Displaying the I-V Curve after the test sequence ..............................................................................................19
5.8 Memory Store ............................................................................................................................................................................. 20
5.9 Memory Recall ........................................................................................................................................................................... 20
5.10 Memory Clear .............................................................................................................................................................................. 21
5.11 Operating Current ..................................................................................................................................................................... 21
5.12 Auto Shutdown.......................................................................................................................................................................... 21
5.13 Error Messages ........................................................................................................................................................................... 22
5.13.1 User serviceable error codes .......................................................................................................................................... 22
5.13.2 Non user serviceable error codes .............................................................................................................................. 23
5.13.3 Overriding the HiSC error code ................................................................................................................................... 23
6 Use with the Solar Survey 200R .............................................................................................................................................. 24
6.1 Pairing with the Survey 200R ............................................................................................................................................ 24
6.2 Put the Survey 200R into transmit mode ................................................................................................................. 24
6.3 Normal operation ...................................................................................................................................................................... 24
6.4 Un-Pairing from the Survey 200R .................................................................................................................................. 24
6.5 Downloading data to PC ...................................................................................................................................................... 25
7 Electrical Specifications ............................................................................................................................................................... 26
7.1 Open Circuit Voltage Measurement (PV Terminals) ........................................................................................... 26
7.2 Short Circuit Current Measurement (PV Terminals)........................................................................................... 26
7.3 Earth Continuity / Resistance Measurement (4mm Terminals).................................................................. 26
7.4 AutoTest Sequence (PV Terminals & Red 4mm Terminal) ............................................................................ 27
7.5 Insulation Resistance, Point to Point (4mm Terminals)................................................................................... 27
7.6 Rpe Voltage Measurement (4mm Terminals) ........................................................................................................ 27
7.7 Operating Current (4mm Terminal via AC/DC Current Clamp) .................................................................. 27
7.8 DC Operating Power (PV Terminals & 4mm Terminal via AC/DC Current Clamp).........................28
8 General Specification ..................................................................................................................................................................... 29
8.1 Instrument Dimensions and Weight ............................................................................................................................. 29
8.2 Connectivity .................................................................................................................................................................................. 29
9 Environmental Conditions ......................................................................................................................................................... 30
10 Maintenance ....................................................................................................................................................................................... 31
10.1 Preparing to work on the Solar PV200/210. ............................................................................................................ 31
10.2 Securing the Solar PV200/210 ......................................................................................................................................... 31
10.3 Cleaning the Solar PV200/210 ......................................................................................................................................... 31
10.4 Battery Replacement ........................................................................................................................................................... 32
10.5 Replacing the Fuse................................................................................................................................................................. 32
10.6 Service and Calibration. ...................................................................................................................................................... 33
Appendix A ............................................................................................................................................................................................... 34

Produktspecifikationer

Varumärke: Seaward
Kategori: Mätutrustning
Modell: PV200

Behöver du hjälp?

Om du behöver hjälp med Seaward PV200 ställ en fråga nedan och andra användare kommer att svara dig




Mätutrustning Seaward Manualer

Mätutrustning Manualer

Nyaste Mätutrustning Manualer